Skip to content

Search results

Searched for "weeke". Found 101 results in 20 milliseconds.

Filter by section:

Displaying results 81 to 90 of 101.

50,000 doors for Sweden

Summary: The production cell in Högsby has been up and running for just under a year – after just a six-week start-up period until fault-free handover – with an extremely high production availability record

Open heart surgery

production system. He was spurred on by a technology tour that he took with the HOMAG Group in Europe. A week of visits to various factories – always displaying the latest technology. The representatives from

The next step — but certainly not the last.

done in recent years, leading to several exciting projects being handled there. For example, a few weeks ago a pharmaceutical company opened a branch at THE CIRCLE, a futuristic new center at Zurich airport

History & Innovations

1985 The first furniture production line is developed BARGSTEDT is integrated into the company 1986 WEEKE is integrated into the company 1987 The first shaped part throughfeed machine for dimensioning and

If you have a problem, you go to the Eibl joinery

you can solve problems." The reason for the call: a global brand needs a trade fair stand – in five weeks. Actually impossible, but as Josef Eibl says at the beginning of our visit: "Things that aren't possible

Step by step to success

Together with a training course, initial support on site and a "very good" hotline, in just two weeks, the employees at Kurt Buck were able to run production without any problems. For Heiko Pape, this

Battistella Company: New edge system with woodFlex cell control.

in terms of small volumes of semi-finished parts for storage. This means that we generally produce weekly batches based on orders, cut these in an optimized way and then process them further in stacks."

Networked production in joineries

and drilling tasks. For the standard tasks involved in drilling and trimming of furniture parts, a WEEKE BHX 055 Optimat processing center was purchased and has proven its worth fully at Daxenberger. "This

Tackling the housing shortage with timber construction

place within a matter of minutes using a crane. The result: All interior rooms were finished five weeks after the building shell had been completed. A preference for solid wood The common practice in timber

All targets for efficient timber construction achieved

around just five days of training, they succeeded in reducing the production time from six to four weeks for this first project. "It all happened extremely quicky and we saved an amazing amount of time in

 

Searching for spare parts?

Spare parts can be found in our HOMAG eShop.