Skip to content

Search results

Searched for "wallteq m-300". Found 28 results in 25 milliseconds.

Filter by section:

Displaying results 21 to 28 of 28.

Modular constructions in different varieties

Peru and one in Colombia 120 employees 80,000 m² production area: 60,000 m² for the production of modular buildings for minings, 2,000 m² for houses and 18,000 m² for the fleets for lease. [...] an automated production line from WEINMANN, which offers us an additional capacity of 2,300 modular units of 40 m² each. Now we are able to produce 3,900 modular units each year. With the automated production [...] panel. In summary, we have a framing station for the frame works, a first multifunction bridge WALLTEQ M-120 for the installation of the interior coating, then it is transferred with a butterfly table

Process steps "shortened"

through the production line, the components pass through further new developments, such as a WALLTEQ M-300 insuFILL with a cleaning mechanism that ensures a clean contact surface of the insulating plate [...] required for large-scale projects. B&O Bau currently states the production capacity of its plant at 25,000 m2/a, but with one-shift operation and cycle times of 40 minutes for a two-layer element and around 20 [...] possible and a second shift to be probable in the foreseeable future, sees potential for up to 200,000 m2/a under full load in the plant. We can assume that the quantities in Frankfurt (Oder) will increase

Fully automated handling increases productivity

produce all element types on both lines? Flier: We have two production lines with two integrated WALLTEQ M-380 multifunction bridges. With the BEAMTEQ B-560 carpentry machine with fully automatic feeding [...] operates the buffer, is fitted with a vacuum suction system that can pick up small parts even down to 300 mm in size. We worked with WEINMANN to develop this stacking technology - the first of its kind in

Sharing Passion. HOMAG at LIGNA 2023

live. World premiere of the new SAWTEQ B-300 and B-400 panel dividing saws Redefining flexibility and performance HOMAG will be presenting the all-new SAWTEQ B-300 and B-400 series panel dividing saws for [...] FEEDBOT W-500 robot automatically places panels on the framework. In conjunction with the new WALLTEQ M-300 multifunction bridge, this creates a flexible and autonomous production cell. This cell secures [...] our LIGNA experience, the highly flexible EDGETEQ S-380 edge bander is equipped with the LOOPTEQ O-300 return conveyor. The workpiece return transports a wide variety of parts and increases overall efficiency

Wood work is on the up

multistory wood work as part of its expansion. After the sheathing has been cut and processed by a WALLTEQ M-340 multifunction bridge, the production line passes timber frame elements on to table 2 in a turning [...] n of the Hungarian association of prefabricated housing, the number of orders increased by around 300% in the prefabricated construction industry alone. But the boom also presented problems. The financial [...] above that, there are maybe 12 or 13 companies that can produce prefabricated elements of up to 13 m in length. They work manually, so they can produce and erect around one house per week. There are only

Modern methods of construction increases productivity

Powys. “The package we settled on included a FRAMETEQ Framing Station, a WALLTEQ M-120 Multifunction Bridge and a MOVETEQ P-300 Work and buffer Station. At half a million pounds, it was a significant [...] In the UK, the Government has set an ambitious target to build 300,000 homes annually by the mid-2020s but constraints, such as the shortage of skilled workers, mean it cannot meet that target using t [...] of six a week. To date, we’ve made 800 of these timber-framed modules and have orders for a further 300. “The advantages of off-site modular construction are that the tenants don’t have to be moved out of

Fit for the new standard

SOCOPA was not primarily concerned with increasing capacity when it in-vested in a new WALLTEQ M-120, a FRAMETEQ F-300 frame work station and three new work tables for its Vagney production facility in 2021

Nesting

Schopfloch, Germany Ausbildung Elektroniker für Betriebstechnik (m/w/d) 2025 HOMAG GmbH Lemgo, Germany Ausbildung Fachkraft für Lagerlogistik (m/w/d) 2025 HOMAG Kantentechnik GmbH All Jobs Machine Finder Step [...] or 5-axis technology Details CNC processing center CENTATEQ T-300 CNC processing center with tandem table Details Multifunction bridge WALLTEQ for nesting Helps to optimize the use of materials A wide range

 

Searching for spare parts?

Spare parts can be found in our HOMAG eShop.