Skip to content

Search results

Searched for "pass". Found 77 results in 17 milliseconds.

Displaying results 51 to 60 of 77.

Networked Workshop (Part 2): Ready for the Future in Three Steps

This step also ensures that the data is validated in the office, and only properly formatted data is passed on to the machine. Workpieces are clearly assigned to production data and processes with the help

Tradition meets high tech: Joinery Koch produces “historic” windows for the Römer building in Frankfurt

money. The glazing bars for the whole window including miter cut are finish recessed during the first pass. Where a number of intermediate steps used to be required, the operator is now able to remove the

HOMAG Treff in Schopfloch & Holzbronn

low changeovers. You can use it to format, profile and edge workpieces from two sides in a single pass. CNC machining: With new speed STORETEQ F-100: The single-axis feeder picks up the pace and transforms

Karl Weinmann passed away at the age of 70

After studying mechanical engineering and working as a development designer, Karl Weinmann set up his own design office in 1982 and, together with Alfred Schlegel, founded WEINMANN + Partner in 1985,

Step by step to success

table, where the second sheathing or the installation level takes place, and then the components are passed on to the receiving table for turning. The receiving table originates from the old production line

If you have a problem, you go to the Eibl joinery

our visit: "Things that aren't possible excite me." The generation change is looming. He wants to pass on this drive to his children. Both are in the boat when important decisions need to be made. In this

SAWTEQ B-320 flexTec robot saw solves bottleneck

combine the same materials and deadlines beyond the jobs. At the same time, it makes sense to only pass special thicknesses through once a day, because they require the greatest changes and slow down p

Wood work is on the up

sheathing has been cut and processed by a WALLTEQ M-340 multifunction bridge, the production line passes timber frame elements on to table 2 in a turning operation. There, employees install the electrics

25 Years of HOMAG Window Production Solutions - Concepts for automated production since 1999

it possible to use two profile cutters simultaneously on one workpiece in one longitudinal milling pass. This ensures that production is always maintained, which is not the case with less flexible, interlinked

The WEINMANN multifunction bridge- optimizing working conditions

drawn again and aligned and executed manually on the table, today, the finished data records are passed on to the machine directly. "That simplifies the planning in the plant and minimizes dimension tolerances

 

Searching for spare parts?

Spare parts can be found in our HOMAG eShop.